DB Schenker Solar Rooftop
Project Details
Plant Size
2,291.4 kWp
Number of Panels
6,840
Type of Panel
Jinko Solar 335Wp
Number of Inverters
20
Type of Inverter
Ingecon 100KW
Annual Energy Produced
3,675,405 kWh/yr
Monitoring System
Meteocontrol
CO2 Saved
1,801 tons/yr
Project Type
Rooftop
- During the construction phase of DB Schenker’s state-of-the-art 35,000 square-meter temperature-controlled warehouse, Amana completed the installation of the Solar PV Rooftop system and commissioned it concurrently with the building completion.
- The Solar PV system is composed of 6,840 high-efficiency 72-cell solar modules and other proprietary components expected to generate 3,675 MWh of energy during its first year of operation and roughly 85,000 MWh throughout its lifetime.
- Amana executed the solar project on a turnkey basis including but not limited to design, engineering, procurement, construction, commissioning, operation, and maintenance.
- Besides the environmental benefit of offsetting around 1,800 Tons of CO2 each year, the PV installation will have an estimated annual electricity savings of 1.63 million dirhams.
- The installation is estimated to cover up to 95% of the total facility’s required energy helping DB Schenker get closer to achieving their sustainability goals.