DB Schenker Solar Rooftop

Project Details

Plant Size

2,291.4 kWp

Number of Panels

6,840

Type of Panel

Jinko Solar 335Wp

Number of Inverters

20

Type of Inverter

Ingecon 100KW

Annual Energy Produced

3,675,405 kWh/yr

Monitoring System
Meteocontrol
CO2 Saved

1,801 tons/yr

Project Type
Rooftop
  • During the construction phase of DB Schenker’s state-of-the-art 35,000 square-meter temperature-controlled warehouse, Amana completed the installation of the Solar PV Rooftop system and commissioned it concurrently with the building completion.
  • The Solar PV system is composed of 6,840 high-efficiency 72-cell solar modules and other proprietary components expected to generate 3,675 MWh of energy during its first year of operation and roughly 85,000 MWh throughout its lifetime.
  • Amana executed the solar project on a turnkey basis including but not limited to design, engineering, procurement, construction, commissioning, operation, and maintenance.
  • Besides the environmental benefit of offsetting around 1,800 Tons of CO2 each year, the PV installation will have an estimated annual electricity savings of 1.63 million dirhams.
  • The installation is estimated to cover up to 95% of the total facility’s required energy helping DB Schenker get closer to achieving their sustainability goals.