Plant Size

2291.4kWp

Number of Panels

6840

Type of Panel

Jinko Solar 335Wp

Number of Inverters

20

Type of Inverter

Ingecon 100KW

Annual Energy Produced

3,675,405 kWh/yr

Monitoring System

Meteocontrol

CO2 Saved

1801.736 tons/yr

Project Type

Rooftop

  • DB Schenker’s second-phase state-of-the-art 35,000 square-meter temperature-controlled warehouse, with a 3,500 square-meter mezzanine area for value-added services, is the largest investment in the history of DB Schenker Middle East & Africa.
  • DB Schenker Solar Rooftop system is being installed while the warehouse is still under construction and will be commissioned concurrently with the building completion.
  • The first solar project of this size to get approved by DEWA while the plot is still not connected to DEWA’s grid.
  • The Solar PV system will be composed of 6,840 high-efficiency 72-cell solar modules and other state of the art proprietary components expected to generate 3,675 MWh of energy during its first year of operation and roughly 85,000MWh throughout its lifetime.
  • Besides the environmental benefit of offsetting around 1,800 Tons of CO2 each year, the PV installation will have an estimated annual electricity savings of 1.635M dirhams.
  • The installation is estimated to cover up to 95% of the total facility required consumption.