Print this Page

Well Services Operational Base for Dowell Schlumberger at Industrial City Abu Dhabi (ICAD II)

Client: Dowell Schlumberger Western S.A.
Consultant: J.M. Regnault & Partners
Location: Abu Dhabi
Completion Date: April 2008
Scope: Turnkey

Located in the Industrial City (ICAD II) of Abu Dhabi, the 11,000 square meter complex consists of a shop and office building, a chemical storage warehouse, a pressure test bay and recreational facilities. Highly complex pre-engineered steel framing was used to design the building’s steel structure in order to complete construction on the project in 270 days.

Permanent link to this article: http://www.amanabuildings.com/industries/oilpowerwater/well-services-operational-base-for-dowell-schlumberger-at-industrial-city-abu-dhabi-icad-ii/