Client: UTE Abener Teyma Emirates
Consultant: URG Group
Location: Abu Dhabi
Completion Date: September 2010 + June 2011 + November 2011
Duration: 8 months + 8 months + 11 months
Built-up Area: 6,000 sqm + 9,800 sqm + 9,800 sqm
Scope: Design-Build
Amana was awarded three contracts for the construction of a wind barrier and plant buildings and facilities for the UAE’s first Thermal Energy Solar Power located near Madinat Zayed in Abu Dhabi.
Amana’s scope of work included the design and construction of:
- Wind barrier
- HTF storage
- Diesel oil storage tanks
- Steam turbine building foundation works as well as the supply and erection of the building structure
- HTF and booster heater foundations
- Technical and non-technical buildings
- Water treatment plant
- Administration building
- Laboratory
- Workshops
- CCM solar field building
Additional, our subsidiary Amana Pipeline Construction was awarded four additional subcontracts on the projects:
- Complete assembly of 9,216 solar module reflectors
- Solar Field erection of the assembled solar module reflectors including the intermediate and central supports
- Engineering, Design, Procurement of Materials, Fabrication, Transport, Erection and Commissioning of the Water and Fuel Oil Storage Tanks
- Mechanical erection of the solar field piping
The National – Sunshine that follows the storm at Shams 1 – February 5, 2012
Zawya - Abu Dhabi’s $600m solar power plant to be completed this year – March 29, 2012