Client: Alfred Talke Logistic Services
Consultant: —
Location: Doha
Completion Date: October 2008
Scope: Design-Build
The terminal complex comprises of 4 buildings featuring a 56,000 square meter covered warehouse, 14,500 square meter silo storage, two fully automatic mobile packaging lines, 20 loading docks, and container storage and transshipment with a capacity of 1000 teu.
The complex sits on an area of approximately 100,000 square meter and was constructed on a design-build basis in 20 months, requiring over 1,000 tons of steel.

