Distribution Center for Borouge at Ruwais

Client

Abu Dhabi Polymers Company Limited (Borouge)

Consultant

Location

Abu Dhabi, United Arab Emirates

Built-Up Area

45,000 square meters

Completion Date

December 2011

Scope of Work

Design-Build

The Distribution Center used for the handling of Polypropylene is constructed on 115,000 square meters of land having a built-up area of 45,000 square meters utilizing 1,000 tons of steel and 50,000 square meters of cladding. The facilities were designed and constructed on fast track basis. The total duration was 11 months, of which the first 3 months where for design and permitting. The actual construction was completed in a timely manner within 8 months.

The Center is used to “free stack” polypropylene bags in 2 high formation, while maintaining NFPA compliant “ESFR” sprinkler system and hose racks. The slab on grade was casted using Laser Screeding technology after the cladding of the structure was installed.

The building is equipped with smoke ventilators, heat ventilators, and high quality industrial doors.

Borouge 3 Certificate of Appreciation
Font Resize
Contrast