Accommodation Units for ADNOC Petroleum Institute at Sas Al Nakhl

Client

Abu Dhabi National Oil Company (ADNOC)

Consultant

Al Torath Engineering Consultants

Location

Abu Dhabi, United Arab Emirates

Built-Up Area

25,378 square meters

Completion Date

April 2011

Scope of Work

Turnkey

Located adjacent to the existing Glenelg Abu Dhabi Schools in Sas Al Nakhl Area, Abu Dhabi, the Petroleum Institute project encompasses the construction of  two buildings with G+4 floors, one building with G+3 floors and another building with G+2 floors. In addition to the above, there is an outdoor sports courts and service block. The project also includes roads, walkways, soft and hard landscaping, and external car parking. The total built up area is approx. 25,000 square meters.

The project was divided into two phases with Phase A handed over within 56 weeks and Phase B within 70 weeks.