Client: Jubail Metal Galvanizing Factory
Consultant: Al-Hamdan Consulting
Location: Jubail
Completion Date: July 2011
Duration: 12 months
Built-up Area: 4,500 sqm
Scope: Turnkey
The project is located at the premises of the Support Industries area in Jubail. The foundation of the plant is made of several tanks with different depths and sizes. Additionally, there are five overhead cranes and a mezzanine floor with a food court and offices.
Amana had executed all civil, architectural, mechanical and electrical works on the project.

